BACKGROUNDER : HOW STT PHT INTL PROCEEDS TO SECURE 3300 MULTI-PLEX PROJECT SITES ACROSS CANADA BEFORE XXII CENTURY

STT - DOMESTIC AND GLOBAL BIO-MULTI-PLEX SUSTAINABLE HABITAT GRID - PHT

2021 A.D.E.     SINCE TIME BEGAN : salus populi suprema est lex - the right of the people is the supreme law : IN TRUTH WE TRUST     2021 A.D.E.

Our (STT PHT) Association With Great Turtle Island Federation (GTIF Group) - UN IGO 2013 Registered) Provides Us With Connections Into 3300 Other Site Locations Across Canada. On-Reserve Lands (8-Million Acres) And Non-Reserve Crown Lands (95% Of Canada) Where We Can Link STT PHT Client Depositors / Investors With Indigenous Multi-Plex (Trigen) Projects - Each Site Developing A $2-Billion Energy Asset Base Attached To A Multi-Plex Project. In Canada Adequate P1-Factor (Our Chosen Energy Base Stock) Resources Are Adequate To Provide Our Required Energy Source For 300 Years.
A) The Multi-Plex Project Is Closed-Loop Electric Energy Supplying Power To Hydroponic Cells / Units (Including Aquaculture) & Bio R&D Centres (Technologies And Practices)
B) The Habitat Centres Will Concentrate Upon Transitioning Into International Medical Tourism / R&D Centres
C) This Format Was Developed In 1982 By Our Corporate Founders & Successfully Negotiated Into Contracts With Ontario And Saskatchewan Provincial Power Ministries In 1990
D) The Interim Years To 2021 Have Been Invested Into Developing The Domestic And International Medicine Chest Network
Summary : Currently, Our STT PHT Business Mission Is To Concentrate Upon Attracting Depositor Clients Into The Trust - Linking Their Investment Interests Into The Matrix Of Domestic And International Multi-Plex Projects Required Today As The World Transitions Its Commercial Agendas Into Climate Reset Survival Missions
Through This Blog Page : The Ten Tranches (Deposits) Into The Client's STT PHT Trust Account : Which Is Illustrated Here @ Our STT PHT Main Page - Our Asset Management Centre : We Will Now Proceed :
1. STT INTL PHT Then Secures A Multi-Plex Project Site
2. Through The Ten $500,000 USD Deposits (Tranches) STT PHT Then Proceeds To Acquire A Project Site @ 5-10,000 Acres (2024-4047 Hectares)
3. And, On This Site We Will Then Proceed To Secure All Required Permits And Licences For The Multi-Plex Energy Project (Trigen)
4. At The End Of The Ten Months, Our STT INTL PHT Client (Depositor  Investor) Then Possesses FMV $2-Billlion Of Certified Energy Assets
5. With These Assets And The AAA+-Rated Electric Power Purchase Agreement We Then Proceed To secure A Lender  Investor Who Will Finance The $200-Million USD Required To Develop This Project - We Allocate / Assign The Power Purchase & $600-Million USD Energy Assets To The Lender / Investor (Could Be The Client Depositor) For The Ten Years Until We Fully Pay Back The $200-Million Debt + Interest
6. The Residual $1.4-Billion USD Of Energy Assets Will Be Used To Build Housing And Commercial Enterprises
Summary : The Time Line For Completing A Multi-Plex Trigen Project Is 800 Days From Approval Of Engineering Drawings. Actual Cash Flow Commences @ Day 820. Net Revenues From The Electric Power Generation And The Hydroponic / Aquaculture Divisions Are Allocated To The Bio R&D Centre - Then, Into Community Infrastructure Projects.